Temporary Plugging Cone

T-PLUG™C

Temporary Plugging Cone

This product is made of materials with high strength, wear resistance and a certain degree of flexibility. It is designed in the shape of a cone, and this unique shape gives it special advantages in temporary plugging operations. It is mainly used for efficiently plugging specific formation channels or wellhead parts during the oil and gas extraction process, so as to achieve precise control of fluid flow and optimize the extraction process.

Product manual download

Characteristics

Tight fit: Its conical surface can evenly bear the pressure, thus forming a well-sealed plugging structure within the pore channel, effectively preventing the leakage of fluids

High compressive strength: The high-strength materials used endow the temporary plugging cone with excellent compressive performance

Application

Temporary plugging in fracturing operations: It is used to temporarily plug the already fractured high-permeability layers, guiding the fracturing fluid into other intervals that haven't been adequately stimulated

Leakage control during workover operations: It can rapidly block the leakage channels, preventing a large amount of workover fluid from leaking and ensuring the smooth progress of workover operations

Technical Specifications

  • Appearance
    Double-headed conical shape
  • Dimensions, mm

    Long axis: 35-45mm

    Short axis: 20-25mm

  • Bearing strength, MPa
    ≥40.00
  • Density, g/cm³
    1.0~1.6
  • Dissolution rate, %
    ≥80.0
  • Others

    The dissolution test temperatures of products with different temperature models are 30℃, 60℃, 90℃, 120℃ and 150℃ respectively

    In the bearing pressure test, the diameter of the short axis / the diameter of the simulated borehole > 1.8